Where we work

Renovations in Marbella town centre

Flats from the 1970s and 1980s in the centre, old-town houses next to the Plaza de los Naranjos and buildings on Avenida Ricardo Soriano and Las Albarizas. We get there quickly from San Pedro de Alcántara along the A-7.

Renovations in Marbella town centre, Marbella

Renovation company in Marbella town centre

In central Marbella most homes are flats in buildings several decades old, with installations that no longer meet today's standards. That's why almost every renovation we do here starts inside the walls.

  • Full renovation of flats
  • Complete rewiring and new consumer unit
  • New plumbing and replacement of soil stacks
  • Open-plan kitchens
  • Bathrooms with level-access shower trays
  • Porcelain tiles or wooden flooring throughout
  • Window replacement for noise insulation

Renovations in the old town

Old-town houses have thick walls, patios and narrow streets where a lorry can't get in. We plan rubble removal and material deliveries within permitted hours and with small vehicles, and we respect the façade features protected by municipal regulations.

Work in residential buildings

Before starting we notify the building's administrator, protect the lift and communal areas and work within the community's permitted hours. If the renovation needs a licence or a declaración responsable at Marbella Town Hall, we tell you which procedure applies.

Renovations near Marbella town centre

We also work in nearby areas such as the Golden Mile and Marbella town centre.

Frequently asked questions about renovations in Marbella town centre

Do you renovate flats in central Marbella?

Yes. We renovate complete flats and also specific jobs such as a bathroom, the kitchen, the electrics or the floors.

Can you work in the old town?

Yes. We organise the job with small vehicles and permitted hours, because many old-town streets can't be accessed by lorry.

Do I need a licence to renovate my flat in Marbella?

It depends on the work. During the visit we'll tell you whether a declaración responsable is enough or a licence is needed, and what paperwork is required.

How long does a full renovation of a flat take?

A flat of around 90 m² usually takes between eight and twelve weeks. After the visit we give you a specific timescale in writing.

Quote

Planning a renovation in Marbella town centre?

Send us a few photos of the space on WhatsApp and tell us what you'd like to change. We'll reply and arrange to see it in person.